The Kirtland Air Force Base Apron Expansion of 242,820 meters was cut by General Contractor AS Horner, Inc. using the GX-4000 saw and XL 14-3000 Red Blades. The depth of cut was 3". 100% of the saw cuts had initiated cracking with no evidence of random cracking.

 
     
     
     
     
     
 

The Soff-Cut Ultra Early Entry™ system was featured at a seminar sponsored by the Southern California Ready Mixed Concrete Association (SCRMCA) and the Western States Chapter of the American Concrete Pavement Association (WSC).

Whitetopping is a concrete overlay 2 to 4 inches thick bonded to an existing asphalt pavement with closely spaced control joints. The asphalt can be in a distressed state. The resulting composite pavement delivers the long life and superior performance characteristics of concrete pavement.